Project Scope
lifting job of replacement of high pressure superheater and tube bundle of waste heat boiler reformer.
Project Deployed Equipment:
600 ton capacity crawler crane.
200 ton capacity mobile tailing crane.
Low bed truck with suitable length.
Lifting Gears.
120 ton load spreader beam.
75 ton load steel slings, 6m each.
75 ton certified shackles.